Sunday, September 23, 2012

Bathroom progressing....

A lot of progress HAS been made.........and a lot still needs to be made.
 
  
 

 
The trim still needs to be painted...
 
 
....and some trim needs to be added....
 


....and the door still needs to be taken down, painted, and rehung.

AND....the ceiling needs to be done!!!


However, it looks tons better....and cleaner...than it did!!!


I don't know if I've mentioned it in previous posts, but this tile surround was already there when we bought SunnyGrace.  The contractor had made some renovations to the house.  Most ceilings had been repaired and most walls repainted...and the tile surround in both the upstairs and downstairs bath. I really appreciate the work they had already done on the ceillings and walls, but I truly wished we'd bought the house before they tiled around the bathtubs. I don't love it. I would have wanted subway tile like in my old house. Jim laid the tile in my previous bathroom.  It looked just like this....and I loved it!!  Oh well!!!!!




No comments:

Post a Comment